Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the jetpack-boost domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Development: 2.96 MW DC BTC2 Community Solar Project | TurningPoint Energy

Project Profile: 2.96 MW DC BTC2

Maryland Community Solar

The 2.96 MW DC BTC2 Community Solar Project was awarded to TurningPoint Energy as part of the State of Maryland’s Community Solar Pilot Program. TPE developed the project and selected Nautilus as the long-term owner and operator, Cypress Creek Renewables as the EPC, and Arcadia Power to manage subscriber participation.

The project is the first of its kind in Baltimore County and had full local support from inception. It is one of three MD Community Solar Projects completed by TPE in 2019.

TPE and its partners:

  • Hired local: Local labor and subcontractors were used for legal, consulting, engineering, construction, and land development aspects of the project.
  • Supported the community: TPE has pledged to donate a total of $90,000 to local organizations in conjunction with the three MD projects, including Kingsville Elementary School, White Marsh Volunteer Fire Department, and Kingsville Fire Department.
CLIENT: Community Solar with BGE
LOCATION:Kingsville, MD
SYSTEM: 2.96 MW DC
COMPLETION:2019
EPC:Cypress Creek Renewables
INVESTOR:Nautilus